Scaffolding Watford WD1

| December 11, 2010 | 0 Comments

The scaffolding around this block of flats in Watford has a tin roof over the top. The insurance company wanted to have plastic sheeting around the block to bring the temprecher up of the roof structure. The scaffolding was erected in march 2010 and over the summer we kept a watch on the plastic sheering as when the wind got up the sheeting got shredded in places.Watford can be a windy place and believe it or not this summer their was lots of wind. Wind lift on the scaffolding’s temporary roof is also a concern and calculations on just how much impact the wind will have on the scaffolding ha e to be undertaken before the scaffolding is erected.

Leave a Reply