Scaffolding Watford WD1

| December 11, 2010 | 0 Comments

The scaffolding around this block of flats in Watford has a tin roof over the top. The insurance company wanted to have plastic sheeting around the block to bring the temprecher¬†up of the roof structure. The scaffolding was erected in march 2010 and over the summer we kept a watch on the plastic sheering as when the wind got up the sheeting got shredded in places.Watford can be a windy place and believe it or not this summer their was lots of wind. Wind lift on the scaffolding’s temporary roof is also a concern and calculations on just how much impact the wind will have on the scaffolding ha e to be undertaken before the scaffolding is erected.

Leave a Reply